Draughtworker
Kam Tin
Preparing formwork and shoring drawing of temporary works for various concrete structures, performing the formwork materials analysis, checking to ensure optimal design, calculate cost of designed formwork and scaffolding solutions with all kind of
$14,000 - $18,000 per month, with Double Pay, Fri: 9:30AM-6:00PM and Sat: 9:30AM-1:00PM, 5 - 5.5 working days per week, Alt. Sat off
Dish Washer
Cleaning the restaurant (including the washrooms) and cleaning kitchen utensils and tableware